Technical Information
LIGHTING SOUND
Desk Strand
520i Desk Soundcraft Live 24 channel
Dimmers 72 x 1k Amps Amcron
MA 12000
Lanterns Profiles 12 x 1k Speakers 4
EV stage 200's (fixed positions)
Fresnels 22 x 1k Equipment 1
Denon CD player
Pars 30 x 1k 1 Sony Midi Disc
Floods 9 x 1k 1 Technics cassette recorder
6 x 1/2 k 2 H&H wedges
Follow Spots 2 x 2k 5 A.T. rifle mics
Strobe 1 x 1500w 4 Sure SM 58 mics
UV
3 x 4' tubes 4 Sure SM57 mics
Temporary Power Supply 1 A.T. switched vocal mic
125 OR 63 amp three phase (c form or tails)
3 Dual D.I. boxes
63 amp single
phase (c form)
Portable Sound
Data Projectors 2 EV Stage 200 speakers
Sanyo XGA Projector 1 Carlsbro
power mixer amp
Sanyo PLC-XP46 Tabs
Haze/ Smoke 1
Pair grey
Smoke Gun Jem ZR
12-AL 1
Pair black
Haze Le Maitre Neutron X5 1 Pair red satin
Stage Area
The stage is raked and has a grey hardboard floor
covering
The red house tabs are wound by hand from the SM
corner. A cyc cloth covers the back wall.
Overhead there are 20 bars each with a SWL of 350 kg
operated by the ASM Spider Winch System
Dressing Rooms
Under the stage are 5 dressing rooms each with sink
and hot water.
There are 2 showers and a small kitchen with washing
machine, microwave and tea making facilities
A chair lift is available to allow access to the
dressing rooms and stage.